BIM Manager Methodology in a Scan to BIM Environment
- Mzukisi Qunta
- Oct 2, 2024
- 6 min read
In today’s rapidly evolving construction landscape, Building Information Modeling (BIM) has become a cornerstone for ensuring streamlined operations, efficient project delivery, and enhanced collaboration across various stakeholders. This article delves into the methodology I employ as a BIM Manager to implement and manage Scan to BIM processes effectively. My goal is to build a robust program that ensures efficiency, data integrity, and seamless project realization through BIM technologies.

What is BIM Management?
BIM management revolves around orchestrating the processes, procedures, and tools needed to ensure BIM is effectively implemented across a project’s lifecycle—from initial design to construction and eventual handover. As James Ocean from Revizto defines it, a BIM Manager is “… a professional who deals with the process of implementing the many procedures and operations mandated during the different phases of project realization” (Ocean, n.d.).
In this role, a BIM Manager oversees the integration of BIM across all stages, similar to a Project Manager but with a sharper focus on the BIM Execution Plan (BEP) and the digital systems used to support collaboration and coordination between teams. The overarching goal is to harness BIM's potential for data-driven project management, ensuring that every aspect—from design to facility management—is optimized.
The Role of a BIM Manager
Given BIM's relatively recent rise in the built environment (especially compared to the construction methodologies of ancient times), the responsibilities of a BIM Manager have evolved over time. While these duties may not always be defined with precision, key tasks include:
Creation and Monitoring of BEP: Developing and regularly updating the BEP to ensure all processes align with project requirements.
Coordinating BIM Teams: Hosting regular coordination meetings with BIM specialists, architects, engineers, and other teams to ensure smooth collaboration.
Process and Data Management: Defining standards, communication protocols, and data-sharing practices within the BIM environment.
Stakeholder Engagement: Maintaining constant communication with project stakeholders, including designers, clients, and contractors.
Reporting and Analysis: Regularly generating reports to track progress, identify bottlenecks, and suggest improvements.
Technology Management: Ensuring hardware and software resources are effectively utilized to support BIM processes.
Innovation and Efficiency: Spearheading new methods or technologies to improve project outcomes.
Integration of BIM with Emerging Technologies
As BIM matures, it is increasingly being integrated with other digital technologies like drones, AI, and IoT, further enhancing project efficiency. The combination of BIM with drones for aerial surveying, AI-powered predictive analytics, and IoT-based real-time monitoring has revolutionized how projects are designed, executed, and managed. These integrations allow for highly accurate data capture, enabling BIM models to be continuously updated with real-world information.
For instance, in the construction and operational phases, IoT sensors embedded in building systems can feed real-time data back into the BIM model, facilitating proactive maintenance, performance optimization, and long-term sustainability management. This convergence of BIM and IoT is particularly useful in facility management, where accurate data on a building’s ongoing performance is crucial for making informed decisions about resource use and energy efficiency.
Elements of the BIM Management Process
Several critical components form the backbone of effective BIM management:
BIM Execution Plan (BEP): This detailed document outlines how BIM will be used throughout the project's phases, covering data standards, processes, roles, goals, tools, and schedules. It is the playbook for BIM implementation (BSI, 2018).
Employer’s Information Requirements (EIR): This document specifies the client's BIM requirements and expectations. It addresses fundamental questions such as why BIM is being used, who is involved, and what deliverables are expected.
Master Information Delivery Plan (MIDP): The MIDP defines all project information deliverables, including schedules, models, drawings, and equipment lists. It ensures that all required information is documented and delivered at the appropriate stages (BSI, 2018).
These documents align with BSI EN ISO 19650, the globally recognized standard for BIM operations. Adherence to such standards ensures that processes remain consistent, data is reliable, and project collaboration is seamless.
Lifecycle of BIM: Beyond Construction
While much of the focus on BIM is during the design and construction phases, one of its most critical roles comes into play during operations and maintenance. Accurate as-built models generated through Scan to BIM enable facility managers to optimize the use of resources, plan for preventive maintenance, and manage the lifecycle of building assets more effectively.
By maintaining a live model of the building, any updates, modifications, or repairs can be seamlessly integrated into the model, thus reducing the risk of information loss and ensuring that stakeholders always have access to up-to-date data. In the long term, this reduces operational costs and extends the lifecycle of building components by ensuring efficient resource management and timely maintenance.
Challenges and Best Practices in BIM Operations Management
Managing BIM operations presents several challenges, such as data interoperability, ensuring stakeholder buy-in, and maintaining consistent data standards across large, multi-disciplinary projects. Often, different teams use disparate tools, which may not communicate effectively with BIM software. This leads to data fragmentation and inefficiencies.
To address these challenges, BIM managers should focus on standardizing data formats and ensuring all project stakeholders adhere to the same collaborative workflows. Creating a comprehensive BEP and MIDP early in the project can prevent many of these issues by setting clear expectations for data sharing and project management.

Furthermore, training programs and workshops can help ensure that all project members, regardless of their role or technical background, understand and engage with the BIM processes. Continuous reviews and audits of BIM procedures during project execution also help identify areas for improvement and keep teams aligned.
The Evolution of Scan to BIM and Its Future Potential
Scan to BIM has come a long way from its initial stages, when it was both labor-intensive and expensive. Advances in laser scanning and photogrammetry technologies have made it more affordable and efficient, allowing project teams to quickly and accurately document as-built environments and integrate that data into BIM models.
Looking to the future, autonomous drones equipped with advanced scanning technology will play an increasing role in capturing real-world data, particularly for large-scale projects and difficult-to-reach areas. These drones will be capable of generating 3D models in real-time, feeding data directly into BIM systems. AI-powered analysis will likely automate many aspects of model creation and validation, further streamlining the Scan to BIM process.
Additionally, the concept of the digital twin—a virtual replica of physical assets—will likely continue to grow in prominence. Scan to BIM will serve as the foundation for creating these digital twins, providing an accurate and up-to-date representation of a building's lifecycle. This has profound implications for smart cities, where real-time data from buildings, infrastructure, and utilities will be used to improve operational efficiencies and sustainability.
Global Adoption of BIM Standards
The global adoption of BIM standards varies significantly. In regions like the UK, BIM Level 2 is mandated for all public-sector projects, driving the rapid adoption of ISO 19650 standards. However, many developing regions face challenges, including lack of infrastructure, training, and resources, which slow the widespread adoption of BIM.
One of the key issues in global BIM adoption is standardization. While ISO 19650 provides an excellent framework, not all local regulations and project needs align with these global standards. BIM managers working in an international context must therefore customize their approach, balancing global best practices with local project requirements. This often involves tailoring the BEP and MIDP to ensure that they meet both international standards and specific local conditions.
Conclusion
The role of a BIM Manager in a Scan to BIM environment is a multifaceted one, requiring a deep understanding of both the technical and managerial aspects of the construction process. By ensuring the effective implementation of BEP, EIR, MIDP, and maintaining strong quality control measures, a BIM Manager plays a pivotal role in the success of construction projects in the digital age. The integration of Scan to BIM with emerging technologies and its future potential, particularly in the context of digital twins and smart cities, highlights the growing importance of BIM in the lifecycle management of buildings and infrastructure.
References
BSI. (2018). ISO 19650-1:2018 Organization and digitization of information about buildings and civil engineering works, including building information modelling (BIM) -- Information management using building information modelling -- Part 1: Concepts and principles. British Standards Institution.
Ocean, J. (n.d.). The role of a BIM Manager. Revizto.
Article by Mzukisi Qunta
Comments