Ireland is an island nation, yet I sometimes think we still underestimate what that really means from an infrastructure and economic development perspective. Around 90% of Ireland’s traded goods pass through the commercial port network. That alone should tell us that ports are not simply places where ships arrive, cargo is unloaded and trucks drive away. They are critical pieces of national infrastructure that connect Ireland to European and global markets (Irish Maritime Development Office [IMDO], 2026).

But there is an opportunity to think about Irish ports differently. Instead of looking at a port purely as a transport facility, what happens if we start looking at it as the anchor for a wider economic ecosystem?

That is the question I want to explore.


I am approaching this subject partly from my professional experience, but also from personal experience. Before moving to Ireland, I had the opportunity to work at the Coega Industrial Development Zone (IDZ) in South Africa. Coega gave me a practical view of what can happen when port infrastructure, industrial development, logistics and economic policy are considered as parts of the same system. I am not suggesting that Ireland should copy Coega. The countries, economies, geography and development objectives are completely different. But I do think Coega provides an example that Ireland can lean on when considering what its ports could become.


A port can be more than a port

The development of the Coega IDZ around the Port of Ngqura in the Eastern Cape is an interesting example because the port was not developed in isolation. The Coega IDZ was designed as a large-scale industrial development zone adjacent to the deep-water Port of Ngqura, with the objective of attracting export-oriented industries and investment. The development incorporated sectors including automotive, metals, energy, logistics, chemicals, agro-processing and maritime activities (African Development Bank, 2021).


The important point for me is the relationship between the infrastructure. The port provides access to international markets. The industrial zone provides space for companies to manufacture, process, store and distribute products. Road and rail infrastructure connect those businesses to the port. Energy infrastructure supports industrial activity. The result is a system in which the port becomes an economic enabler rather than simply an endpoint for freight.


Having worked at Coega, this is something I saw as more than a concept on a planning document. The physical relationship between the industrial development and the port made the wider economic model much easier to understand. That experience has influenced how I look at Ireland's ports. The question is not simply whether Ireland has enough berths. The question is what economic activity those berths can enable.


Ireland already knows that capacity is becoming an issue

Ireland is not starting from zero. The current review of National Ports Policy is already recognising that Ireland's port requirements are changing. The 2023 Irish Ports Capacity Study examined port capacity against future demand through to 2040, while the revised draft National Ports Policy published in 2026 identifies a need for additional east-coast port capacity in the coming decades (Department of Transport, 2026; IMDO, 2026).


This is important because it suggests that the conversation is already moving beyond maintaining existing infrastructure. Trade volumes are growing, vessels are getting larger, Ireland's population and economy are changing, and new industries such as offshore renewable energy are creating completely different requirements from traditional cargo operations. Dublin Port illustrates this challenge particularly well.


The 3FM Project is the final major project within Dublin Port's Masterplan 2040 and is intended to bring the port to its ultimate planned capacity by 2040. The project is estimated at approximately €1.1 billion and focuses primarily on the Poolbeg Peninsula. It includes additional capacity for unitised cargo, a new Southern Port Access Route and a bridge across the River Liffey, while also providing infrastructure that can support future rail-enabled freight movements (Dublin Port Company, 2026).


Dublin is therefore not simply expanding a quay. It is reorganising how a major national logistics asset interacts with transport infrastructure, surrounding communities and future freight demand.


But Dublin cannot do everything

One of the biggest questions for Ireland is whether the future should revolve around making Dublin Port increasingly large, or whether Ireland should develop a stronger network of specialised ports. I think the second approach deserves serious consideration. Ireland's geography provides several different maritime opportunities.


Cork has deep-water infrastructure and is developing its Masterplan 2050 around the movement of port operations downstream into the lower harbour. The Port of Cork describes this as a once-in-a-generation transition intended to accommodate larger vessels, consolidate operations and strengthen connectivity for the southern region. The port also has planning permission relevant to offshore renewable energy development (Port of Cork, 2026).


Waterford is pursuing its own development path. Its proposed 250-metre Belview Terminal extension would support offshore renewable energy and general port activity, including additional quay infrastructure, reclaimed land, operator facilities, warehousing, workshops and crane installations (Port of Waterford, 2026).


Shannon Foynes and the Atlantic opportunity

Shannon Foynes has many of the ingredients that make a port-led development strategy interesting. It has deep water, significant land availability, an established bulk-handling operation and direct access to the Atlantic. Shannon Foynes Port Company states that the estuary has water depths of up to 32 metres and identifies up to 1,200 hectares of land potentially available for port development (Shannon Foynes Port Company, 2026).


More importantly, the development is not being considered simply as an expansion of conventional cargo handling. Foynes Island is proposed as a major deep-water development, with an 800-metre terminal. Around 400 metres would support offshore wind marshalling and assembly, while the remaining 400 metres would provide a multipurpose terminal. The proposal also includes approximately 25 hectares of hard-standing space (Department of Transport, 2025).


The project received a Maritime Area Consent determination in July 2026, marking an important step in the development process (Maritime Area Regulatory Authority, 2026).

There is also a crucial piece of inland infrastructure being developed alongside it.

The 42-kilometre Limerick to Foynes railway line, which has been inactive since 2001, is being renewed for freight services, with commissioning planned for the second half of 2026. The project is intended to reconnect the port with Ireland's rail freight network and provide an alternative to road-based freight movements (Iarnród Éireann, 2026).


This is beginning to look much more like an integrated infrastructure system.

  • Port

  • Rail

  • Industrial land

  • Energy

  • Offshore wind

  • Logistics.


That is much closer to the model I experienced at Coega.


Offshore wind could change the role of Irish ports

Perhaps the biggest opportunity is not container shipping at all, it could be offshore renewable energy. Ireland's Offshore Wind Industrial Strategy, Powering Prosperity, was designed specifically to ensure that Ireland captures more of the economic value associated with the offshore wind industry rather than simply importing equipment and services. The strategy included 40 actions covering supply chains, research and development, regional economic development and future demand for renewable energy (Department of Enterprise, Tourism and Employment [DETE], 2024).


By April 2026, the Government reported that 90% of the strategy's 40 actions had been completed, with further work continuing on Ireland's wider renewable-energy industrial strategy (DETE, 2026).

That matters for ports, an offshore wind farm requires much more than turbines at sea.

  • It requires fabrication

  • Assembly

  • Heavy lifting

  • Storage

  • Specialist vessels

  • Subsea cables

  • Marine engineering

  • Maintenance

  • Warehousing

  • Road and rail logistics

  • Operations and maintenance bases

  • Manufacturing.


A port that can support these activities can generate economic activity far beyond the quay wall. This is why Ireland's existing multi-port approach to offshore renewable energy is interesting. Government policy has already recognised that several ports will be required for different activities and at different stages of offshore wind development, rather than expecting one location to perform every function (Department of Transport, 2021).

That is a very different way of thinking about port infrastructure, it is a network.


Could Ireland develop its own version of a port-industrial ecosystem?

This is where I think Ireland has an opportunity to learn from international examples without trying to replicate them, Coega is one example. Another is Rotterdam, where port infrastructure has developed alongside industrial clusters, energy infrastructure, logistics and extensive inland connections.


Antwerp-Bruges provides another example of how a major port can operate as part of a much wider industrial ecosystem, with chemicals, manufacturing, logistics and energy infrastructure integrated around maritime trade. The lesson is not that Ireland needs a Rotterdam or a Coega. Ireland does not have the same scale of cargo or industrial land.

The lesson is that successful ports can become platforms for economic activity.

The question becomes, What economic activity can this port make possible?


What about the Northern Sea Route?

There is another development that makes this conversation worth having.

In August 2026, Sealegend Shipping began a scheduled seasonal container service between China and Northern Europe using the Northern Sea Route. The initial programme involves eight crossings between August and October, linking China with European ports including Felixstowe, Rotterdam and Hamburg (AdriaPorts, 2026).

It would be premature to suggest that this route is about to replace the Suez Canal.

The current service is seasonal, uses comparatively small vessels by major Asia-Europe standards and remains exposed to the practical challenges of Arctic navigation, including ice conditions, insurance, operating costs and the limited navigable season.

But it demonstrates something important. Trade routes can change.


For decades, infrastructure planning has often been based on established patterns of global trade. Yet geopolitical disruption, climate change, new energy systems and changing shipping economics can create new routes and new infrastructure requirements. Ireland should not build a port strategy around the assumption that Arctic shipping will become a major part of Irish trade. But Ireland should be thinking about whether its ports are flexible enough to benefit from changing trade patterns.


Ireland's western position could become an advantage

Ireland sits on the western edge of Europe and faces the Atlantic. That can sometimes feel like a disadvantage when looking at access to continental European markets. But it can also be an advantage. A well-connected deep-water port on the Atlantic can potentially serve multiple markets and industries.

  • Europe.

  • North America.

  • The Atlantic offshore energy sector.

  • Global bulk commodities.

  • Project cargo.

  • Renewable-energy equipment.

  • And potentially new maritime trade routes as they emerge.

Shannon Foynes is particularly interesting in this context because its development strategy already connects port expansion with offshore wind, logistics, industrial land and transatlantic connectivity. That does not mean it will become Ireland's equivalent of Rotterdam. It means that Ireland has an opportunity to develop something appropriate to its own scale and geography.


The infrastructure behind the port

There is one part of this discussion that I think deserves more attention. A port development is only as good as the infrastructure around it. A new deep-water berth is of limited value if the road network cannot move the cargo. An industrial park is of limited value if electricity capacity is insufficient. A logistics hub is of limited value if there is no rail connection. An offshore wind assembly facility is of limited value if the quayside cannot support the required loads.


And none of these projects work particularly well if planning, environmental assessment, procurement, digital information management and quality systems are treated as separate issues. This is where infrastructure planning becomes important. The future Irish port is not just a civil engineering project. It is a multidisciplinary information and infrastructure system.

  • Civil engineering.

  • Structural engineering.

  • Transport planning.

  • Energy.

  • Marine engineering.

  • Environmental management.

  • Digital engineering.

  • BIM.

  • Asset management.

  • Quality assurance.

  • Operations.

These systems have to work together.


That is one of the reasons I find the port discussion particularly interesting from a BIM and quality perspective. The more complex the infrastructure becomes, the more important reliable information becomes throughout the asset lifecycle. The port of the future will not simply need bigger cranes. It will need better-connected infrastructure.


A possible Irish model

If I were looking at Ireland's ports from an infrastructure-development perspective, I would not start by asking which port should become the biggest. I would ask what each port could become particularly good at. Dublin could continue to function as the country's primary east-coast gateway for high-volume freight and passenger connectivity.


Cork could strengthen its role around deep-water shipping, energy and southern regional trade. Shannon Foynes could develop around Atlantic logistics, offshore wind, bulk cargo and industrial activity. Waterford could strengthen its position in the southeast, particularly around offshore renewable energy and regional logistics.

Killybegs could potentially develop its existing maritime capabilities into a stronger offshore services and renewable-energy role.


Rosslare can continue developing its importance as a direct European freight gateway and offshore renewable-energy logistics location. These roles do not have to compete with one another. They can complement one another. That is the part of the Coega experience that I think is most relevant. Infrastructure works best when the individual pieces are connected to a wider economic purpose.


From gateways to economic engines

Ireland has already started moving in this direction. The current investments at Dublin, Cork, Shannon Foynes and Waterford show that port infrastructure is being considered alongside freight growth, offshore renewable energy, energy transition, rail connectivity and regional development. The question now is whether these projects can be connected by a broader national vision. Ireland does not necessarily need to build one enormous port.


It may be more appropriate to build a national port ecosystem. A network of ports with different strengths, connected by road and rail, supported by energy infrastructure, surrounded by industrial and logistics activity, and integrated into Ireland's wider economic strategy. That is where my experience at Coega influences how I look at this.

Working within the Coega IDZ gave me an appreciation of what happens when port infrastructure is viewed as part of a much larger development system. The port was important, but it was the relationship between the port, industrial land, logistics, energy, manufacturing and investment that gave the wider development its purpose.

Ireland has its own version of the ingredients. The challenge is connecting them.


The Northern Sea Route may become commercially important. Offshore wind almost certainly creates a major infrastructure requirement. Global supply chains will continue to change. Ireland's trade requirements will continue to grow. The opportunity is therefore bigger than simply building additional quay space. It is about deciding what Ireland wants its ports to do for the economy over the next 20, 30 and 50 years. A port should move cargo. But the most valuable port may be the one that also helps create the businesses, industries, jobs, energy infrastructure and supply chains that make the cargo worth moving in the first place.


That is the difference between a gateway and an economic engine. And perhaps that is the next stage of Ireland's port story.


References

  • AdriaPorts. (2026, August 11). Arctic Route: Sealegend launches weekly China-Europe container service. AdriaPorts.

  • African Development Bank. (2021). Development perspectives on special economic zones in Africa: Lessons from experiences. African Development Bank.

  • Department of Enterprise, Tourism and Employment. (2024, March 8). Powering Prosperity: Ireland’s offshore wind industrial strategy. Government of Ireland.

  • Department of Enterprise, Tourism and Employment. (2026, April 21). Powering Prosperity: Final implementation progress report. Government of Ireland.

  • Department of Transport. (2021). Government sets policy for Ireland’s commercial ports to develop infrastructure to support offshore renewable energy. Government of Ireland.

  • Department of Transport. (2025, March 27). Written answers: Offshore renewable energy port infrastructure. Houses of the Oireachtas.

  • Department of Transport. (2026). Revised draft National Ports Policy. Government of Ireland.

  • Dublin Port Company. (2024). 3FM Project. Dublin Port.

  • Iarnród Éireann. (2026). Limerick to Foynes freight line. Iarnród Éireann.

  • Irish Maritime Development Office. (2026). National Ports Policy. Department of Transport.

  • Maritime Area Regulatory Authority. (2026). MAC20230024: Shannon Foynes Port Company. MARA.

  • Port of Cork. (2026). Port of Cork Masterplan 2050. Port of Cork Company.

  • Port of Waterford. (2026). 250 Berth Development: Belview Terminal Extension. Port of Waterford.

  • Shannon Foynes Port Company. (2026). Shannon Foynes Port. Shannon Foynes Port Company.

 
 
 